How to Install Solar Panels : Wiring for Solar Panels

Posted by admin | Posted in Solar Energy | Posted on 17-09-2010


The wiring will connect the solar panels to the charge controller. Learn about wiring for solar panels from a professional in this free energy conservation video. Expert: Roger Bacon Bio: Roger Bacon is the owner of RGB Home Repair and Renovation in Santa Barbara California. He has experience in all phases of home repair and renovations such as plumbing, heating and solar power. Filmmaker: Diana Bacon

How to Install Harbor Freight Solar Panels Part 1

Posted by admin | Posted in Solar Energy | Posted on 27-08-2010


This video shows how I used the 45 watt solar panel kits from Harbor Freight and also their single 15 watt solar panels to create a array of 28 panel delivering 420 watts. During the summer and fall in Texas I can count on a solid 8-9 hours of good sunlight so solar power makes sense to augment my wind turbines. Solar panels are easier to install and require less upfront work than wind turbines. In this video I show you the hardware you need and how to assemble and wire the solar panels for quick production.

Solar Panels to Rail Install on Gridtie Project

Posted by admin | Posted in Solar Energy | Posted on 12-08-2010


Here I continue adding panels to my gridtie system with particular commentary on string voltages, top-mount clamp fastening systems and grounding.

how to install vertical axis wind turbines (wind generators) www.carbonfreeenergy.cn

Posted by admin | Posted in Wind Energy | Posted on 28-07-2010


Silent Wind Turbine . The Vertical Axis Wind-Power Turbine ( VAWT ) is a new product designed . We started the research on VAWT 15 years ago. Now many of the famous experts the world wide have accepted such new technology and this technology will definitely lead the development of the small and middle size wind-power turbines. Following are the detail features of such VAWT: Safe in operation: Due to the usage of the vertical blade and the force support is of triangle form, the wind force will mainly press on the wheel. So the blades will not be able to fall down, to be broken or to be thrown far away. Noise: The way of the turning of the blades is of horizontal and the design of the blade is of the scheme of the wing of the air-plane, so in operation the VAWT will not make any noise. Capacity of wind resistance: Due to the advantage of the design of the VAWT, the press force the turbine suffered is minimized and as the result such VAWT can stand on the extra strong typhoon of 45 m/s. Space requirement: It needs much smaller working space than other kinds of wind-power turbines. Thus not only saves the space, but also aises the working efficiency. Power curve: It needs lower wind speed for its starting and the increasing of the power is slow and stable. So its production capacity is 10-30% higher than other kinds of turbines. Scope of the wind power needed: Due to the adoption of the new control system, this VAWT is suitable to be used in the wind speed scope from 2.0 25 m

Suntech – Unique Two in One PV Panel Design & Easy to Install Mounting Solution- buildaroo.com

Posted by admin | Posted in Solar Energy | Posted on 27-06-2010


SunTech introduced their Reliathon 270-watt module at this year’s Solar Power International. Wei-Tai, VP of Marketing for SunTech, spoke with the Buildaroo News Team about this products unique characteristics. Watch the video above to see the modules as well as a demonstration of SunTech’s innovative mounting system. Some unique characteristics include: self-aligning panels, integrated grounding, and wire management, as well as a new “Two-in-One” design, with two 36-cell regions featuring independent circuits that can create better output on fixed tilt systems in early morning and late afternoon. All module innovations result in far less labor time needed to install Reliathon systems as well as significant reductions in material costs. Array Technologies’ DuraTrack(TM) system was designed specifically for Suntech Reliathon, and makes use of two motors per MW AC versus the typical four motors per MW, further reducing the material costs of the system. The new Suntech Reliathon ground mount system perfectly matches Reliathon modules to deliver fixed tilt solutions at lower cost and greater profitability. Utility-grade Reliathon module warranty: The Reliathon module includes a 25-year utility-grade warranty offering an industry-leading 12-year limited product warranty (extended from 5 years) and a 25-year peak power performance warranty now based on annual degradation instead of 12 and 25-year step-downs. The new annual peak power performance warranty provides Reliathon

Get Adobe Flash playerPlugin by wpburn.com wordpress themes

Powered by Yahoo! Answers